Waterbury Student Lounge
Rehab Waterbury Hall - Student Lounge

CURRENT PROJECTS

Planning

Design

Completed Projects
Description Benef. Occup.
Rehab Waterbury Hall 04.2017
Replace PCB Transformers 10.1999
Replace Windows in Stairwell/Lounges 08.1996
Rehab Emergency Lighting  10.1996
Install Security Screens - Ground Floor 07.1996
Replace Roof 11.1992
Complete Entrances 09.1992
Rehab Showers/Tubs 09.1992
Replace Windows 08.1990
Provide Smoke Detectors  01.1990
Correct Moisture Problem - Bath Ceilings 09.1989
Asbestos Abatement  02.1989
Rehab Fire Alarms 06.1986
Replace Steam Tube Bundles 05.1986
Repairs to Transformers 05.1986
Install New Ceilings  05.1985
Replace Defective Heating Controls 06.1984
Install Electric Meters  03.1984
Provide Emergency Generator for Lights 10.1983
Replace Lock Cyclinders 09.1983
Steam Flow Meters  08.1982
Install Gas Main to Central Heating Plant 08.1982
Replacement of Batteries & Battery Chargers 07.1980
Install Insulation in Heating Equipment 07.1977
Install Storm Windows 02.1977
Repair Heating Systems  01.1977
Install Central Emergency Light System 11.1976
Install Combination Storm/Screens Windows 081976
Roof Repairs 08.1972