Laker Hall Study Lounge
Laker/Athletics Study Lounge

CURRENT PROJECTS

Design

Construction

Completed Projects
Description Benef. Occup.
Asbestos Abatement 04.2017
Program Study for Intercollegiate Athletics 04.2017
FFE Study Laker/Athletics 04.2017
Laker Hall Exterior Rehab for Critical Maintenance 02.2017
Laker Hall Pool - Mechanical & Plumbing Rehabilitation 11.2014
Laker Hall Pool - Mechanical Upgrades 01.2009
Replace Campus Fire Alarm System 06.2001
Replace PCB Transformers 10.1999
Replace Bleachers/Refinish Flooring  01.1999
Rehabilitation of Locker Room 03.1998
Rehab Pool Mechanical Equipment 06.1997
Improve Existing Handicapped Doors/Ramps 01.1996
Abate Asbestos  12.1995
Abate Lower Machine Room Asbestos 10.1995
Rehabilitate Steam Traps 04.1995
Replace Exterior Doors 06.1994
Replace Condensate/Feed Water Receiver 02.1993
Replace Roof  08.1992
Install Energy Efficient Lights Aux Gym 12.1989
Alterations for Safety - Phase V 06.1989
Air Monitoring of Asbestos Project 05.1989
Develop ECM  01.1988
Repair Bleacher Operating Mechanism 01.1988
Replace Boiler 10.1987
Seal Stairs to Basement  06.1987
Provide Halide Lighting Fixtures 02.1987
Asbestos Containment 12.1986
Replace Gymnasium Lighting Fixtures 06.1986
Energy Conservation Study - Cycle VI 10.1985
Repair One Bleacher Operating Mechanism 06.1985
Replace Underwater Lights 11.1984
Provide Energy - Efficient Air Dampers 07.1984
Recaulk Wall Panels 12.1981
Energy Conservation Measures 09.1981
Recoat Roof 12.1979
Install Turbulators in Boiler #1 12.1976
Repairs to Power Operated Bleachers 07.1974
Mens Health and Physical Education 08.1968