Description | Benef. Occup. |
Asbestos Abatement | 04.2017 |
Program Study for Intercollegiate Athletics | 04.2017 |
FFE Study Laker/Athletics | 04.2017 |
Laker Hall Exterior Rehab for Critical Maintenance | 02.2017 |
Laker Hall Pool - Mechanical & Plumbing Rehabilitation | 11.2014 |
Laker Hall Pool - Mechanical Upgrades | 01.2009 |
Replace Campus Fire Alarm System | 06.2001 |
Replace PCB Transformers | 10.1999 |
Replace Bleachers/Refinish Flooring | 01.1999 |
Rehabilitation of Locker Room | 03.1998 |
Rehab Pool Mechanical Equipment | 06.1997 |
Improve Existing Handicapped Doors/Ramps | 01.1996 |
Abate Asbestos | 12.1995 |
Abate Lower Machine Room Asbestos | 10.1995 |
Rehabilitate Steam Traps | 04.1995 |
Replace Exterior Doors | 06.1994 |
Replace Condensate/Feed Water Receiver | 02.1993 |
Replace Roof | 08.1992 |
Install Energy Efficient Lights Aux Gym | 12.1989 |
Alterations for Safety - Phase V | 06.1989 |
Air Monitoring of Asbestos Project | 05.1989 |
Develop ECM | 01.1988 |
Repair Bleacher Operating Mechanism | 01.1988 |
Replace Boiler | 10.1987 |
Seal Stairs to Basement | 06.1987 |
Provide Halide Lighting Fixtures | 02.1987 |
Asbestos Containment | 12.1986 |
Replace Gymnasium Lighting Fixtures | 06.1986 |
Energy Conservation Study - Cycle VI | 10.1985 |
Repair One Bleacher Operating Mechanism | 06.1985 |
Replace Underwater Lights | 11.1984 |
Provide Energy - Efficient Air Dampers | 07.1984 |
Recaulk Wall Panels | 12.1981 |
Energy Conservation Measures | 09.1981 |
Recoat Roof | 12.1979 |
Install Turbulators in Boiler #1 | 12.1976 |
Repairs to Power Operated Bleachers | 07.1974 |
Mens Health and Physical Education | 08.1968 |