August 25, 2014

SUNY Oswego has committed to a three year expansion of the campus wifi with the first locations being completed by mid-September.

Year 1 of the three year plan includes wifi expansion to Mahar, Rich, Lanigan second floor, Lee/Shineman Quad, Sheldon Ballroom and Culkin.

August 18, 2014

In partnership with Public Affairs, CTS would like to announce the availability of the "LabStats" module in the SUNY Oswego mobile app.  You can find it in the bottom row of the app.

 

February 10, 2014

Welcome back to the Spring semester. As we are only in early February, "Spring" semester seems to be a misnomer, but I am sure that warmer weather is not far away.

Winter break allowed CTS to accomplish quite a few items to prepare for the start of school. Here are a few highlights:

September 19, 2013

Yesterday Apple released the new iOS7 operating system for iPhone and iPad. If you’re already upgraded, you may have noticed that you had to “Accept” a new certificate after connecting to “Oswego-Secure”. This is intended and necessary in order for your iDevice to work on the network. CTS has tested and approved iOS7 for the campus network, and it is considered supported software.

September 9, 2013

CTS spent much of the summer preparing for the opening of SUNY Oswego's newest building, the Shineman Center for Science, Engineering and Innovation.  The $118 million, 233,000 square foot building is home to the College’s sciences departments including Chemistry, Biology, Physics, Earth Sciences, Computer Science, Engineering, and Mathematics.

September 9, 2013

The beginning of the semester brings an exciting new effort for the use of iPads in the classroom.  The Provost's office, CELT, and CTS are jointly sponsoring a pilot that will allow faculty accepted into the program to experiment with how the devices can be used for teaching, learning and other innovative uses.

September 9, 2013

Last spring, CTS worked with our Campus Technology Advisory Board to survey the campus on their satisfaction with the services we provide to the campus.  The results of that survey indicated that the campus wi-fi needs to be more reliable and easier to use. Since then, a re-design of wi-fi has become one of our highest priorities.

September 9, 2013

Over the last two years, CTS has been aggressively equipping residence halls with wi-fi. This summer ended that project with the completion of Onondaga Hall.  Over 200 access points were installed throughout the ten-floor building. All residence halls now have wi-fi coverage in individual rooms as well as public gathering spots such as lounges.

September 5, 2013

With the release of the new iPhone 5S just around the corner, you may be stowing away for the latest & greatest offering from Apple. However, those who are content with their current iPhone model may want to take steps to keep it fast and ready for the new iOS 7 (Apple's latest Operating System for the phone).