Skip over primary navigation
Swetman_Poucher Resolution - 11/21/01
Swetman-Poucher Resolution - 11/21/01
 

The Campus Concept Committee endorses the general program mix proposed for the Swetman-Poucher renovation project as presented in plan C-6 drafted by Holt Architects.

As the Project moves into the design stage, the Concept Committee is very concerned that the final design adheres closely to the original mission statement for the Swetman-Poucher renovation project.  That mission statement emphasized academic space as the distinctive heart of the Swetman-Poucher renovation. The Concept Committee wants to ensure that the final design for the Swetman-Poucher renovation will retain the intended mix of classrooms, faculty meeting space and informal gathering places for students, faculty and staff that were part of our original vision.

 Last Updated: 7/9/07