Campus powering up

Power is returning on a building-by-building basis to the SUNY Oswego main campus, with full campus expected to be up around 3 p.m. Most of the campus had temporarily lost power due to a National Grid issue shortly after noon.

(Posted: Apr 28, 2011)

Tags: