Skip over primary navigation
Proposal Preparation
Rates Needed to Prepare a Proposal
Fringe Benefits
 07/01-06/30

 FY08

 FY07

 FY06

 FY05

Regular

35.5%

34.50%

35.00% 

33.00%

Summer Only 

14.5%

 14.50%

15.50% 

15.50%

Graduate 

11.0%

 10.50%

10.50% 

9.00%

Undergraduate 

4.0%

4.00% 

4.00% 

3.00%

IFR (NYS Rate) 

45.03%

45.03%

 43.03%

41.99%

Indirect Cost Rates

 07/01-06/30

 FY08

 FY07

 FY06

 FY05

Federal

76% S&W

76% S&W

 74.5% S&W

 74.5% S&W

Nonfederal

49.8 TDC

58.9% TDC

 58.9 TDC

 58.9% TDC

Travel

 01/01-12/31

 FY08

 FY07

 FY06

 FY05

 Milage  

 .445

 0.445

 0.405

Last Updated: 7/9/07