Rice Creek Field Station

 

 

RC pavilion JAN 2013


January 2013
The new pavilion has a metal roof.
The pond, covered in ice and snow, can be seen
to the left beyond the shrubs.
The Herb Garden is to the right out of camera range.

 

 

RC garage JAN2013

January 2013
The new garage is located approximately
in the same place as before.

 

 

RC south side

 

December 2012

The south side [backyard] of the main building.
The entrance to the Green trail is to the right.



RC east side        December 2012           RC entry

East side view.  The entrance is on the far right.                Inside looking east.  The entrance is on the left.

RC NOV 2012 4

 

Late November 2012 looking north
from across Rice Creek.  Insulation has begun.
The main building is being enclosed
in preparation for winter.

 



RC Nov 2012 3 November 2012 looking west from the parking area entrance you can see the locations of the buildings.

RC NOV 2012 1          November 2012           RC NOV 2012 2
To the right is framing for the pavilion.                                      In the back right is framing for the garage.

RC new bldg OCT 2012

 

October 2012 looking southwest. 
They've raised the roof and are making progress on the pavilion and garage.

 

 

RC new bldg framework

 

September 2012 looking southwest.
The framework for the new building is taking shape.

 


RCFS no bldg

 

 

July 2012 looking northeast. 
All that remains of the main building is the foundation.