January 2013
The new pavilion has a metal roof.
The pond, covered in ice and snow, can be seen
to the left beyond the shrubs.
The Herb Garden is to the right out of camera range.

January 2013
The new garage is located approximately
in the same place as before.

December 2012
The south side [backyard] of the main building.
The entrance to the Green trail is to the right.
December 2012 
East side view. The entrance is on the far right. Inside looking east. The entrance is on the left.

Late November 2012 looking north
from across Rice Creek. Insulation has begun.
The main building is being enclosed
in preparation for winter.
November 2012 looking west from the parking area entrance you can see the locations of the buildings.
November 2012
To the right is framing for the pavilion. In the back right is framing for the garage.

October 2012 looking southwest.
They've raised the roof and are making progress on the pavilion and garage.
.jpg)
September 2012 looking southwest.
The framework for the new building is taking shape.

July 2012 looking northeast.
All that remains of the main building is the foundation.












Forms, information for prospective student-athletes.