Construction Map, Starting Fall 2010

Downloadable map of construction area (pdf, 6.1 MB)
Fall walkways and fences for construction
As east campus construction continues on multiple fronts, this updated map shows fence lines, the resulting walkways and roadways for campus traffic. The fencing around the Piez/sciences complex, red line at center, has enlarged to encompass the north end of Wilber Hall, protecting pedestrians from work on the 13,000-foot addition to the north and west sides of Wilber. The red line at bottom center surrounds the science complex's geothermal field, which was formerly a 150-space commuter parking lot, and a smaller adjacent employee lot west of Sheldon Hall. Additionally, the School of Education's Park Hall is now closed for extensive renovations, and fencing will go up in early 2012 to encompass that construction work. Faculty and classes from Park moved to Wilber Hall and Hewitt Union over the summer. The dotted red line at lower right shows where scaffolding will move in and out as needed for the ongoing historic preservation of Sheldon Hall.